Stainless piping groups
Acidic and alkaline chemical cleaning of spool piping and designated process systems.
Featured project · Ahal, Turkmenistan
Our field experience on a world-scale project.
When commissioned in 2019, Ahal GTG was described by Kawasaki as the world’s largest gas-to-gasoline plant. On this project, built by the Rönesans–Kawasaki consortium, we carried out chemical cleaning work using our own circulation pumps and equipment.
Figures refer to the plant’s design capacity. Kawasaki · Guinness: first GTG plant

Ahal · Turkmenistan
GTG-INT Project
Ahal GTG · Rönesans / Kawasaki project
Our 2016–2019 project records cover acidic and alkaline chemical cleaning of stainless spool piping, storage tanks and designated process systems. These photographs show our pumps, team and application arrangements on the Ahal project.
Explore the scope and field videoAcidic and alkaline chemical cleaning of spool piping and designated process systems.
Cleaning of storage, oxygen and nitrogen tanks within the defined project scope.
Post-cleaning surface inspection and protection of cleaned components from recontamination.
Selected field work
Different systems and site conditions. A defined application scope for each project.
TurkmenistanBoiler systems
Chemical cleaning was performed on waste heat boilers, power steam boilers and removal units.
View project record
Antalya, TurkeyBoiler systems
Chemical cleaning was performed at Unit #5 and Unit #6 CCPP-HRSG 820 MW power plant.
View project record
Mersin, TurkeyBoiler systems
Chemical cleaning services were provided at Unit #2 and Unit #4 CCPP-HRSG 120 MW facilities.
View project recordAksa Energy · Antalya
Field records from HRSG chemical cleaning in units 5 and 6 at the Aksa Energy Antalya combined-cycle power plant. These photographs from our 2011 project archive show internal surfaces, drum and pipe arrangements, and a treatment stage.
View the project recordFacility scale
820 MW
Power plant capacity stated in the project document. The chemical cleaning reference covers the HRSG systems in units 5 and 6.
Explore our HRSG cleaning serviceProject archive
Search by project name or location and explore records in each service area.
Pre-commissioning and maintenance chemical cleaning in power and cogeneration plants.
Explore the related service
Chemical cleaning was performed on waste heat boilers, power steam boilers and removal units.

Chemical cleaning was performed at Unit #5 and Unit #6 CCPP-HRSG 820 MW power plant.

Chemical cleaning services were provided at Unit #2 and Unit #4 CCPP-HRSG 120 MW facilities.
Pre-commissioning cleaning
Pre-commissioning chemical cleaning services were provided at Unit #1 CCPP-HRSG 130 MW facility.
Chemical cleaning was performed at Unit #2 CCPP-HRSG 60 MW facility.
Chemical cleaning services were provided at Unit #7 and Unit #8 CCPP-HRSG 120 MW facilities.
Chemical cleaning on waste heat boiler circuits
Industrial chemical cleaning services were performed on Cogeneration-II Plant waste heat boiler circuits.
Project-specific field applications for tanks, spool piping and facility circuits.
Explore the related service
Acidic and alkaline chemical cleaning was performed on stainless spool pipes, liquid storage tanks, oxygen and nitrogen tanks, and HP-01, DV-01, MP-03, DV-03 and 1FU-02 systems.
Watch the project field video here.
Water-side cleaning and conditioning for steam boilers in industrial facilities.
Explore the related serviceChemical cleaning on six steam boilers
Chemical cleaning services were performed on six steam boilers within the factory.
Chemical cleaning on a 430 m² water-tube boiler
Industrial chemical cleaning services were performed on a 430 m² water-tube boiler.
Chemical cleaning on a 160 m² Scotch marine steam boiler
Chemical cleaning services were performed on one 160 m² Scotch marine steam boiler.
Chemical cleaning on two 225 m² steam boilers
Industrial chemical cleaning services were performed on two 225 m² front-fired Scotch cylindrical steam boilers.
Chemical cleaning on three 510 m² water-tube steam boilers
Chemical cleaning services were performed on three 510 m² water-tube steam boilers.
Boiler cleaning and boiler water treatment
Chemical cleaning and boiler water treatment services were performed on two 100 m² steam boilers.
Deposit removal in cooling towers and industrial cooling circuits.
Explore the related serviceChemical cleaning within the cooling unit circuit
Chemical cleaning services were performed on equipment within the cooling unit circuit.
Chemical cleaning on two cooling towers
Chemical cleaning services were performed on two Evapko-France cooling towers.
Chemical cleaning on three cooling towers
Industrial chemical cleaning services were performed on three cooling towers.
Chemical cleaning of evaporative condensers and chiller condenser units.
Explore the related serviceEvaporative condenser chemical cleaning
Chemical cleaning was performed on the evaporative condenser at the S.S. Ağaköy Agricultural Development Cooperative facility.
Cooling tower condenser cleaning
Chemical cleaning was performed on the Apikoğlu cooling tower condenser.
Chemical cleaning on chiller condenser units
Industrial chemical cleaning services were performed on two condenser chiller units.
Activated carbon loading and resin replacement in water treatment units.
Explore the related serviceActivated carbon refill and resin replacement
Activated carbon refill was performed on three activated carbon columns; resin and inert resin replacement was carried out on three water treatment units.
Industrial chemical cleaning of heat plant and water installation circuits.
Explore the related serviceChemical cleaning on heat plant and water installation circuits
Industrial chemical cleaning services were performed on heat plant and water installation circuits.
Project records reflect company and team field experience. MW figures refer to facility capacity; cleaning scope is described in the relevant project record.
Your next field project
Contact us for a technical assessment and solution proposal for your chemical cleaning needs.