Before Commissioning
Assess oils, loose residues and surface oxides associated with fabrication, installation and storage. Plan required flushing, degreasing and chemical stages according to manufacturer requirements and the approved procedure.
Project-specific field services
Pre-commissioning and maintenance chemical cleaning of heat recovery steam generators at power plants.
Discuss Your Project
Manufacturing and construction residues before commissioning and deposits during operation require different cleaning approaches. We assess cleaning boundaries, system metallurgy and customer, EPC or OEM procedures to plan project-specific field work.
For HRSG chemical cleaning projects, we mobilize our own circulation pumps and application equipment to sites in Türkiye and internationally. Equipment shipment and site setup are planned around the project schedule and local logistics requirements.
Our Equipment and Mobilization ApproachAssess oils, loose residues and surface oxides associated with fabrication, installation and storage. Plan required flushing, degreasing and chemical stages according to manufacturer requirements and the approved procedure.
Assess deposits, operating history and available inspections together. Cleaning requirements and methods depend on system condition rather than a fixed operating-time interval.
Consider available site inspections, operating and water-chemistry records, previous cleaning information and any tube samples or deposit analyses. Deposit loading and composition provide technical input to cleaning decisions, particularly for high-pressure evaporators. Sampling and assessment scope follows facility and manufacturer requirements.
Determine whether economizers, evaporators, drums and connected circuits are included by reviewing P&IDs and manufacturer procedures. Assess HP, IP and LP materials and connections separately. Other circuits, such as superheaters and reheaters, are addressed only within the defined project scope and procedure.
Review P&IDs, metallurgy, available deposit information and manufacturer procedures.
Define cleaning boundaries, temporary connections and circulation arrangements for the project.
Perform flushing and required chemical stages in the approved sequence.
Monitor procedure-specific application parameters and chemical analyses.
Complete final operations, including required neutralization and passivation, against project acceptance criteria.




Chemical type, concentration, temperature, duration and acceptance criteria are defined for each project according to system conditions and the approved procedure.
Our project records include HRSG cleaning in units 5 and 6 at Aksa Energy Antalya and work at Mersin Soda, Nuh Energy and BİS Energy.
Explore Our Project Records
Pre-commissioning water flushing and chemical pre-cleaning tailored to piping and process-system requirements.
Explore Service
Cleaning scale, mineral deposits and oxide layers on the water side of steam and waste heat boilers.
Explore Service
Scale and deposit removal in cooling towers and associated circuits, selected for equipment construction.
Explore Service
Deposit removal in plate and tubular heat exchangers, condensers and chiller equipment.
Explore Service
Pre-cleaning, flushing and chemical cleaning of process piping, spool groups and tanks.
Explore ServiceTell us about the equipment, deposit type and application requirements. Together, we can identify a suitable solution for on-site cleaning or chemical products used by your own team.